Westminster Waste

Upgrade recycling facility required to handle three distinct waste streams.

Location

London, UK

Footprint

65m x 35m

Application

Construction & Demolition (C&D)
Commercial & Industrial (C&I)

Throughput

Up to 60 tonnes per hour

The Challenge

Westminster Waste Ltd, a leading waste management company in London, needed to upgrade its recycling facility to handle three distinct waste streams: Construction and Demolition (C&D), Commercial and Industrial (C&I), and Wood. This marked the third time Westminster Waste Ltd partnered with Kiverco, demonstrating their continued trust in Kiverco’s expertise.

The main objectives were to achieve 100% landfill diversion, increase throughput, improve purity of recovered materials, and reduce reliance on manual labour. Integrating advanced automation technologies was crucial to optimise waste separation and maximise operational capacity at their new site in central London.

The Kiverco Solution
  • Primary shredder
  • Long part separator
  • Belt weigh scales
  • Waste screen
  • 3-way drum separator
  • Magnet (2)
  • 4 bay single sided picking station
  • Optical sorter
  • 4 bay double sided picking station
  • 2-way drum separator
  • Eddy current separator
  • Trommel screen
  • 4-bay double sided picking station
  • Conveyors
  • Dust extraction and filter system
  • Material bays/bunkers
  • Plant control system
  • CCTV system
  • Compressed air system
  • Plant stair access and walkways
Recycling Plant for Westminster Waste

This is a huge investment for Westminster Waste Ltd, so it was important to work with a highly reputable company who knows what they are doing to deliver our newest facility.

Kiverco has been a huge support to us over many years and we are delighted that they have once again designed and delivered an excellent solution to support our company’s future growth.”