Britaniacrest Recycling
Upgraded facility to process both Construction and Demolition (C&D) waste and Commercial and Industrial (C&I) waste more efficiently.
Location
Surrey, UK
Footprint
80m x 50m
Application
Construction & Demolition (C&D)
Commercial & Industrial (C&I)
Throughput
Up to 45 tonnes per hour
The Challenge
Britaniacrest Recycling Ltd, a family-owned waste management company in Surrey, has been operating since 1993. As demand for their services grew, they needed to upgrade their facility to process both Construction and Demolition (C&D) waste and Commercial and Industrial (C&I) waste more efficiently. Their key objectives were to divert more waste from landfill, generate energy from waste, reduce labour costs, and maximise operational uptime.
The Kiverco Solution
- Primary shredder
- Belt feeder
- Long part separator
- Magnet (4)
- Waste screen
- 2-way drum separator
- 4-bay double sided picking station
- 2-bay double sided picking station
- Flip flow screen
- DS150 (density separator)
- Belt weighing scales
- Dust filter system
- Conveyors
- Material bays/bunkers
- Plant stair access and walkways
- Plant control system
- CCTV camera system
- Plant control room

We have been working with Kiverco for many years and have been consistently impressed by the durability of their products and their exceptional aftercare support. When it came to upgrading our facilities, we needed a trusted partner who understands the work we do, and Kiverco has once again delivered with an impressive plant.

