Binn Group
Kiverco Delivers Its Fourth Recycling Plant for Binn Group
Location
Perth, UK
Footprint
77m x 25m
Application
Construction & Demolition (C&D)
Throughput
Up to 50 tonnes per hour
The Challenge
Binn Group, a leading Scottish waste management company, needed an innovative recycling plant to support their growing operations and sustainability goals. As a third-generation family business and long-time Kiverco customer,
Binn Group sought a solution that would not only manage Construction and Demolition (C&D) waste but also contribute to their green energy initiatives, including converting waste into energy. The new facility needed to enhance throughput, improve material purity, and support their transition to wind-powered operations to reduce their carbon footprint.
The Kiverco Solution
- Combi screen
- Magnets (3)
- 3-way drum separator
- Double sided picking station
- Optical sorter
- 2-bay double sided picking station (2)
- 2-way drum separator
- Eddy current separator
- Conveyors
- Material bays/bunkers
- Dust extraction and filter system
- Plant stair access and walkways
- Plant control system
- Plant control room

"Kiverco has never let us down. Their excellent customer service and unwavering support have made them our go-to partner for new recycling solutions.”