Binn Group

Kiverco Delivers Its Fourth Recycling Plant for Binn Group

Location

Perth, UK

Footprint

77m x 25m

Application

Construction & Demolition (C&D)

Throughput

Up to 50 tonnes per hour

The Challenge

Binn Group, a leading Scottish waste management company, needed an innovative recycling plant to support their growing operations and sustainability goals. As a third-generation family business and long-time Kiverco customer,

Binn Group sought a solution that would not only manage Construction and Demolition (C&D) waste but also contribute to their green energy initiatives, including converting waste into energy. The new facility needed to enhance throughput, improve material purity, and support their transition to wind-powered operations to reduce their carbon footprint.

The Kiverco Solution
  • Combi screen
  • Magnets (3)
  • 3-way drum separator
  • Double sided picking station
  • Optical sorter
  • 2-bay double sided picking station (2)
  • 2-way drum separator
  • Eddy current separator
  • Conveyors
  • Material bays/bunkers
  • Dust extraction and filter system
  • Plant stair access and walkways
  • Plant control system
  • Plant control room
Recycling Plant for Binn Group

"Kiverco has never let us down. Their excellent customer service and unwavering support have made them our go-to partner for new recycling solutions.”

Get In Touch

  •   26 Gortnaglough Road, Dungannon, Co. Tyrone, N. Ireland BT71 5EE
  •   +44 (0) 28 8773 8811
  •   marketing@kiverco.com

Follow Us