Averda
A robust waste processing plant in the challenging environment of the Saudi desert
Location
Saudi Arabia
Footprint
98.5m x 26m
Application
Construction & Demolition
Throughput
50 tonnes per hour. Recovers up to 10 different waste products.
The Challenge
Averda, one of the largest waste management companies in the Middle East, required a robust waste processing plant in the challenging environment of the Saudi desert, near the Red Sea. This project highlights Kiverco’s ability to deliver high-performance solutions in extreme conditions. The plant needed to process Construction and Demolition (C&D) waste while supporting Averda’s environmental goals in a rapidly growing region.

The Kiverco Solution
- Belt feeder
- 3-bay double sided pre-sort picking station
- Combi screen
- Magnet (2)
- 2-way drum separator
- 5-bay - double sided picking station
- Dust filter system
- Conveyors
- Material bays/bunkers
- Plant control system
- Plant stair access and walkways

This is a hugely important project for Averda and for Saudi Arabia. It was critical for us to choose the right partner to provide a waste recycling plant as we must meet stringent targets on throughput and recovery rates.
Kiverco are very well known for their design and build quality and have a long history dealing with this type of waste.